189 results - Storage rooms for rent: Canton Bern

  • An industrial building exterior, featuring a large white wall with a name and logo reading 'HOFMANN NEOPAC TINS AND TUBES'.
  • Parking area with several cars parked, metal building, fallen leaves, autumn trees
  • Industrial building, metal siding, white exterior, large open garage doors, paved parking lot, adjacent building
  • empty warehouse, large roller doors, pallet jacks, pallet cages, concrete floor, metal beams
  • Warehouse with grey concrete flooring, high ceilings with exposed steel beams, white and grey walls, yellow demarcation line on the floor, multiple pallets and crates along the side.
  • industrial warehouse, spacious, high ceilings, concrete floor, metal racks, large aisle, storage boxes, metal storage bins
  • warehouse filled with various items on pallets, metal beams, fluorescent lights, yellow and green markings on floor
  • Empty warehouse with high ceilings, concrete floor, stacked pallets, forklift and worker
  • Wide warehouse space, yellow floor, metal beams, overhead lights, storage boxes, glass windows.
  • A large open space with concrete floors and a glass roof. The interior has several pillars and equipment pieces spread throughout. There are various metal structures and machinery visible, and the space is illuminated by fluorescent lights on the ceiling.
  • Empty manufacturing plant with yellow flooring, industrial machinery, overhead storage racks, large open space, metal structure roof, metal pipes, and one person.
  • Large industrial warehouse with yellow painted walls, industrial machinery, carts, and tables with equipment
  • Empty office room with glass windows, black office cubicles, desks, monitors, keyboards, whiteboard on wall, trash bin
  • Long conference table, chairs, windows, projectors, radiators
  • Office room, empty, white table, blue chair, grey modular office, light ceiling, open doors
  • open plan dining area with multiple tables, wooden flooring, several plants, white ceiling, large windows
1 / 17
21,000m²CHF 120.– / m²
Top
Eisenbahnstrasse, 3645 Gwatt (Thun)

Flexible storage, logistics, and sports facilities from 500 m² in Gwatt (Thun)

Flexible storage, logistics, and sports facilities in the Thun industrial area Located on Eisenbahnstrasse in Thun, versatile storage, high-bay warehouse, and office spaces are available for rent. The area is ideal for logistics, storage, production, or combined uses and impresses with its excellent accessibility and maximum flexibility in space and contract design. The rental spaces are freely combinable from approximately 500 m² to over 20,000 m². Depending on the needs, pure storage spaces, high-bay warehouses, and additional office spaces can be rented. Contract duration, level of completion, and floor space are agreed upon individually with the ownership – also renovations or adjustments are possible depending on the contract duration. The infrastructure includes several truck docks, spacious transshipment areas, as well as a private, covered rail connection directly in the hall. The halls have high floor loads, spacious room heights, and good technical equipment. Parking spaces, common areas, and a canteen are also available. According to the currently applicable building and zoning regulations, the construction of sports facilities is also permitted in the hall (padel, trampoline, fitness, etc.). The rent starts from approximately CHF 120.–/m²/year, but is strongly dependent on floor space, usage, construction standard, and contract duration. Available for occupancy by agreement. An extremely flexible offer for companies with individual requirements for space, contract duration, and design.

Travel time
-
1 / 4
906m²CHF 26,500.–
Weyermattstrasse 12, 2560 Nidau

Villa Collective Nidau | BE

Villa Collective Nidau | BE The Villa Collective Nidau is a high-quality and established health and care property in a preferred, central location in Nidau. The architecturally convincing ensemble consists of a listed villa from 1896, a pavilion-like intermediate building (2008), and a wheelchair-accessible new building with living studios (1990), which are functionally and structurally connected to each other.The complex is supplemented by a historic garden house with a hip roof and an aviary (built in 1928) as well as a well-maintained outdoor area with green spaces, a bicycle shed, and outbuildings. The villa and the garden house are listed in the cantonal inventory of historic buildings and underline the representative character of the property.The entire complex has been successfully operated as a retirement and care home since 2012 and is currently rented to Tertianum. The existing lease agreement expires in September 2027.Thanks to the fully available care infrastructure, the spacious and flexible room structure, and the zoning WG3 (residential / commercial / office), the Villa Collective is suitable for both a seamless continuation in the care or health sector and for alternative, permissible uses in the service, education, or administration environment. Building division & structural structure Old building - Villa (built in 1896)The listed villa with a hip roof and dormer windows extends over two full floors, a converted attic, and a basement. The vertical access is via a two-flight staircase with a half-landing; a lift is not available in the old building.The facade is made of exposed brick with ornamental stone alternation and careful sandstone articulation. Partially, double-glazed wooden windows are available. Rafflamellen shutters serve as sun protection. The rooms are equipped with historic radiators with Danfoss regulation.The main entrance is via a staircase or ramp on the west side into the intermediate building.On the ground floor, there are community and dining rooms.In the basement, there is a central laundry room, the heating room (Gastherme Elco, 2011, boiler 400 l), a food storage room, and a cold room with two cooling cells (2013).The 1st floor houses office spaces.In the attic, there is an externally rented 3.5-room apartment.The floor coverings on the ground floor consist mainly of parquet, supplemented by antique plate coverings in corridors and staircases as well as plate coverings in wet cells and kitchens. Intermediate building / Pavilion (built in 2008)Between the villa and the new building lies a single-story pavilion, which is used as a lounge and dining room. It includes a buffet and part of the kitchen, which is functionally connected to the main kitchen in the old building.The intermediate building is accessible both via the western main entrance and via an additional wheelchair-accessible entrance on the east side. The building is not basements and is finished with a flat roof. New building (built in 1990)The new building with a gable roof and dormer windows has three full floors, a converted attic, and a basement. A centrally located spiral staircase on the north side and a Schindler lift (1988, control renewed in 2021) connect all floors and ensure fully wheelchair-accessible access.Access is via the intermediate building.On the ground floor, there is an entrance hall with a chimney and a lounge area as well as six studios with bathrooms and balconies.On the 1st floor, there are more studios and a central area with an office, kitchenette, toilet, and hygiene room for station or night watch.On the 2nd floor and in the attic, there are additional studios. All units have a balcony, bathroom, barrier-free design, and a patient call system.In the basement, there are a lounge, therapy and storage rooms, and the house and lift technology; this area is also directly accessible via a western outdoor staircase. Construction technology & infrastructureConstruction method and technology • Old building: Jurassic limestone foundation, partially Hourdis ceiling in the basement, hip roof with slate covering, electrical cables under plaster, well-preserved sanitary facilities • Intermediate building: concrete foundation, column structure with ventilated wooden facade, wood-wood windows, electric lamella shutters, floor heating, wall boiler (200 l), audio system • New building: Concrete construction with cantilevered balconies, double-shell masonry, Eternit roof, shelter in the basement, sound-reducing plaster in the basement, double-glazed wooden windows, Rafflamellen shutters Domestic technology • Elco gas heaters (2011) for old and new buildings • Two standby boilers (2021) in the new building, each 779 l • Heat distribution via radiators, convectors • Lift system Schindler (1988), control renewed in 2021 Gastronomy & secondary infrastructure • Fully equipped gastro-kitchen for about 30-50 meals per day • Replacement gastro-cooking stove February 2023 • Two independent cooling cells in the basement with separate compressors • Goods lift between basement and ground floor • According to the feedback from the kitchen staff, the kitchen operation is fully functional Parking & secondary rooms • Approx. 8 outdoor parking spaces on the south side of the plot • 8 parking spaces in a neighboring car park • Additionally, 2 covered parking spaces in the entrance area • Storage room available in the car park Maintenance & renovationsThe entire complex has been well maintained.In 2023, the flat roof of the pavilion was renovated.

Travel time
-

Suggested properties for you based on search results

Other interesting objects