"Mobile home in chalet style free to take away – against complete dismantling and removal"
Address
6410 GoldauPrice
- Purchase price:
- CHF 1.–
Main information
- Availability:
- Immediately
- Type:
- Chalet
- No. of rooms:
- 3
- Number of floors:
- 1
- Surface living:
- 45 m2
- Room height:
- 2.1 m
- Year built:
- 2008
Characteristics
Fireplace
Documents (0)
Description
We are looking for a responsible private individual or a specialist company to take over our well-maintained mobile home in chalet style and give it a second life at a new location.
The mobile home has been carefully maintained over many years and features three rooms, a kitchen, a bathroom, and an additional, separable annex.
Free takeover against complete dismantling and removal at your own cost and responsibility. The clearance of the current site must be completed by 31 March 2027 at the latest, preferably earlier.
Our wish is to continue using the mobile home instead of having to demolish and dispose of it.
Room layout and equipmentThree rooms with windows
Kitchen with gas stove
Bathroom with toilet, shower, and sink
Electric ceiling heating in the bathroom and dressing room
Furniture and various fixtures
Dimensions:
Main building: 11.23 × 3.02 m
Annex: approx. 4.01 × 2.55 m
Additional equipment and accessories:
Additional, separable annex with insulation and heating
Boiler (approx. 150 liters) and water pump
Underground water tank (approx. 7,000 liters)
Outdoor chimney, floor plates, and granite
Hollywood swing, table, and chairs
Satellite TV
Separate tool shed, workbench, and extensive tools
Further inventory and accessories
Various trees and plants that can also be taken over if desired
The exact scope of the components to be handed over will be determined jointly before the takeover.
Conditions for takeoverComplete dismantling and removal at the cost and responsibility of the taker.
The taker bears all costs for dismantling, loading, transport, and possible rebuilding.
The current site is not part of the offer.
Transportability, suitability for rebuilding, and required permits are to be clarified by the taker themselves.
The complete clearance must be carried out by 31 March 2027 at the latest.
The takeover conditions and the scope of the inventory will be agreed upon in writing.
The former constructor and co-builder is likely to be available for questions about the construction, assembly, and dismantling after agreement. The scope and availability are to be agreed upon separately.
Inspection and contactAn inspection is possible by arrangement in case of serious interest.
Contact: meilen-stein@bluewin.ch
We ask that you only contact us if you have a serious interest and the necessary personnel, technical, and financial capabilities for a professional dismantling and removal.
We look forward to interested parties who want to give our mobile home a second life.
Best regards
The owners
Mortgage Calculator
From dream house to home ownership: the mortgage calculator can help you estimate the affordability of this property.
Create an account for more options
Create your account to manage your favorites across all devices, keep track of your search alerts, and never miss an update. Everything you need for your home search, all in one place!
Contact
Monika und Jürgen
- Listing ID
- 4003570294
- Object ref.
- c3eh2.xd5wu








