"Apartment building "Bachblick" - Ground floor apartment"
Address
Dorfstrasse 21, 5082 KaistenPrice
- Purchase price:
- CHF 550,000.–
- Notify on price drop
Main information
- Availability:
- By agreement
- Type:
- Apartment
- No. of rooms:
- 2.5
- Number of bathrooms:
- 1
- Floor:
- GF
- Surface living:
- 66 m2
- Year built:
- 2027
Documents (0)
Description
The newly planned apartment building "Bachblick" with four residential units is located in the village center of Kaisten. The architecture of the new building consciously references the formal language of the former historic building at this location. This creates a building that combines modernity with history.
The bedrooms of all residential units are oriented towards the cooler north side, while the living areas open towards the sunny south side.
From the spacious outdoor areas, you can enjoy the sound of the Kaisterbach stream. Parking is available in the ground-level parking garage, which is directly connected to the staircase.
Look forward to an energy-efficient construction method according to the latest standards with a water-air heat pump, comfortable underfloor heating, and excellent sound insulation. Spacious wood-metal windows with triple glazing provide bright living spaces and a pleasant living climate.
The stylish kitchens are equipped with high-quality appliances and offer an individual selection budget. You also benefit from attractive selection options for floor coverings, sanitary appliances, and other interior fittings, and can design your new home according to your personal ideas. Spacious terraces, seating areas, or arbors round off the attractive offer.
Your highlights at a glance
- Sustainable construction method according to modern energy standards
- Air-water heat pump & underfloor heating
- High-quality kitchens and individual construction options
- Triple-glazed wood-metal windows
- Elevator and barrier-free access
- Own washing machine and dryer in each apartment
- Preparation for e-mobility
- Quiet, natural location with attractive outdoor areas
- Expected move-in date: Summer 2027
Work on the building envelope is progressing. The facade plasterer is currently creating the external thermal insulation, while the carpenter is working on the area of the ventilated wood facade. At the same time, the roofer is working on the roof, so that the roof tiles can be laid soon.
In the interior construction, the plasterer is currently carrying out the basic plastering work. The next steps will be the installation of the underfloor heating and subsequently the installation of the subfloor.
Mortgage Calculator
From dream house to home ownership: the mortgage calculator can help you estimate the affordability of this property.
- Listing ID
- 4003548155
- Object ref.
- VK.E01.26








